Difference between revisions of "Filth"

From Technologia Incognita
Jump to: navigation, search
(Created page with " ==Operation Filth== or, How to inflate our dirty room to 200% ===Date/Period:== Unknown, not set yet, to be determined ===Participants/volunteers:=== (if for a specifi...")
 
m
Line 4: Line 4:
 
or, How to inflate our dirty room to 200%
 
or, How to inflate our dirty room to 200%
  
===Date/Period:==  
+
===Date/Period:===  
  
 
Unknown, not set yet, to be determined
 
Unknown, not set yet, to be determined

Revision as of 14:29, 25 August 2014

Operation Filth

or, How to inflate our dirty room to 200%

Date/Period:

Unknown, not set yet, to be determined

Participants/volunteers:

(if for a specific part, please indicate that behind your name):

Rough task list, to be refined

  • Relocate remaining network equipment outside, well shielded from dust(!!)
  • Take just about everything out of the rooms, store intelligently. Dustproof the rest.
  • Make sure the high tables in front of the window are not blocked by that stuff
  • Take out the parts of the ceiling tiles and supports that will interfere with our work
  • Take out the air conduits that risk getting pierced/damaged by flying debris.
  • Tape dustproof/watertight everything that needs protecting, like the fusebox and...
  • Disconnect the electricity outlet+cable that is inside the wall we're taking down.
  • Tape the door+doorframe so dust is contained inside rooms as well as can be
  • Arrange for protective wear: dust masks, eyewear, ear protection, builders' helmets...
  • Break wall down (with what, possibly rent tool?)
  • Dispose of the debris. Inquire what (if any) possibilities exist at UR
  • Plaster/fixup walls where needed. Paint 'em too?
  • Clean everything up well
  • Where needed, egalize floor so it can support laminate
  • Put in laminate floor, wall to wall
  • Remove wood from door bottom to accomodate new floor
  • Design/purchase/build a (rubber?) dustproof strip to put on door.
  • Rearrange ceiling slats so the ceiling will be seamless
  • Cut ceiling tiles to match, where needed
  • Block off one door, (possibly using extra insulation?)
  • Build and secure the benches using the high tables as frames + Gamma plywood
  • Paint/varnish the benches (perhaps??)
  • Put some powertools in, where appropriate, like on walls or on dedicated platforms.
  • Put sink in, drill through wall to kitchen, arrange water conduits
  • Redo/expand/fix electricity. People have expressed desire for emergency cut-off switch
  • Arrange storage space for:
    • Wood; sheets
    • Wood; scrap pieces
    • Wood, metal, plastic; lengthy stuff like rods, pipes, sticks, etc
    • Wood, perhaps metal; large beams
    • Metal; scraps and small sheets
    • Power tool storage off the benches
    • Screws, plugs, bolts; re-hang red drawers etc
    • Hand tools from tool board and/or office drawer block
  • Put everything that remains back in