User:3p1c
TechInc Member | |
---|---|
nickname | 3p!c |
Memberstatus | member |
Tasks | being present while lurking mate |
URL | http://www.justopen.org |
iwantmy@freedom.nl | |
Part of Projects | BlackHat-RGB-LedMatrix, FOSDEM, Domotica, Maemo, Arduino, Rpi, Soldering, Android, Another World Now, Internet Governance and hackers, Beehive-Embeded-Electronical-System (Bees) |
Free text: Hell yeah! I'm for Free text!
I'm for Free things in general, free-source also ATM i'm not attending as many socials as I would like due to several reasons. in 2020 I promised myself to attend more. So i decided something. Since the house is such a big bunch of projects, keeping me away from the space and i'm learning a lot from them to make them TechInc projects! This way i'm more socially available in the space, AND other people can join in and help/criticise/learn.
One reason is my health which sadly has in some mysterious ways left me wanting. So I'm health hacking ATM also. But also the total renovation of a 30's house which is going to be rigged with domotica in almost every way thinkable by me.
House:
Plans: - Drawn in 3D in Sketch-UP (which was the only workable option with my architect).
Walls/Separation - Most of the walls are going to be done in metal stud.
mostly because the choice fell on sliding door system from Xinnix which IMHO are very nice. and i think easily mod'dable with Magnetic locks. but easily integrate-able with metal stud walls. Plus less wood which saves trees and less work cutting it all to size. Hope it will soundproof as well as a woodframe drywall.
- Doors systems, most of them are installed already downstairs in the souterain (posh French for half basement)
Wiring
- ATM already 1,5Km's of CAT 8 cable is installed in the walls.
- Most of the electric 220v cabling is in place
- Most of the signalling cable is in place (sensors, automated doors etc)
- Switch cupboard
- Switchboard EATON Medusa 72 modules, https://www.groepenkastbestellen.nl/EATON-EAT-GR.KAST-MEDUSA-LEEG-per-1-stuk(s)-
- 20 x 16a EATON automatic switches
- 4 lightning surge protectors (moeller series) http://www.eaton.co.za/EatonSA/ProductsSolutions/Electrical/ProductsServices/CircuitProtection/SurgeProtectionDevice/index.htm
- Relais board (going to use hacked and flashed Sonoff 4ch Pro mostly atm
Heating - Most of the airventilation is in place (air and heat recycling unit) - Most the airpipes for the environmentally friendly central heating powering fireplace need to still be placed
Plumbing - Dyka Sono partially in place still some parts need doing in the basement mostly - Uponor ISO 20mm still need doing - Pentair Jung Compli 300e sewage fecal pump still needs to be installed -