Difference between revisions of "User:3p1c"
Line 8: | Line 8: | ||
|Project=BlackHat-RGB-LedMatrix, FOSDEM, Domotica, Maemo, Arduino, Rpi, Soldering, Android, Another World Now, Internet Governance and hackers, Beehive-Embeded-Electronical-System (Bees) | |Project=BlackHat-RGB-LedMatrix, FOSDEM, Domotica, Maemo, Arduino, Rpi, Soldering, Android, Another World Now, Internet Governance and hackers, Beehive-Embeded-Electronical-System (Bees) | ||
}} | }} | ||
− | Hell yeah! I'm for Free text! | + | Free text: Hell yeah! I'm for Free text! |
− | I'm for Free source also | + | I'm for Free things in general, free-source also |
ATM i'm not attending as many socials as I would like due to several reasons. | ATM i'm not attending as many socials as I would like due to several reasons. | ||
− | One is my health which sadly has in some mysterious ways left me. So I'm health hacking | + | in 2020 I promised myself to only attend more. |
− | But also the total renovation of a | + | |
+ | One reason is my health which sadly has in some mysterious ways left me wanting. So I'm health hacking ATM also. | ||
+ | But also the total renovation of a 30's house which is going to be rigged with domotica in almost every way thinkable by me. | ||
+ | |||
+ | House: | ||
+ | |||
+ | Plans: | ||
+ | - Drawn in 3D in Sketch-UP (which was the only workable option with my architect). | ||
+ | |||
+ | Walls/Separation | ||
+ | - Most of the walls are going to be done in metal stud. | ||
+ | mostly because the choice fell on sliding door system from Xinnix which IMHO are awesom | ||
+ | and i think easily mod'dable with Magnetic locks. but easily integrate-able with metal stud walls. | ||
+ | Plus less wood which saves trees and less work cutting it all to size. | ||
+ | Hope it will soundproof as well as a woodframe drywall. | ||
+ | - Doors systems, most of them are installed already downstairs in the souterain (posh French for half basement) | ||
+ | |||
+ | |||
+ | Wiring | ||
+ | - ATM already 1,5Km's of CAT 8 cable is installed in the walls. | ||
+ | - Most of the electric 220v cabling is in place | ||
+ | - Most of the signalling cable is in place (sensors, automated doors etc) | ||
+ | - Switch cupboard | ||
+ | - Switchboard EATON Medusa 72 modules, https://www.groepenkastbestellen.nl/EATON-EAT-GR.KAST-MEDUSA-LEEG-per-1-stuk(s)- | ||
+ | - 20 x 16a EATON automatic switches | ||
+ | - 4 lightning surge protectors (moeller series) http://www.eaton.co.za/EatonSA/ProductsSolutions/Electrical/ProductsServices/CircuitProtection/SurgeProtectionDevice/index.htm | ||
+ | - Relais board | ||
+ | |||
+ | Heating | ||
+ | - Most of the airventilation is in place (air and heat recycling unit) | ||
+ | - Most the airpipes for the environmentally friendly central heating powering fireplace need to still be placed | ||
+ | |||
+ | Plumbing | ||
+ | - Dyka Sono partially in place still some parts need doing in the basement mostly | ||
+ | - Uponor ISO 20mm still need doing | ||
+ | - Pentair Jung Compli 300e sewage fecal pump still needs to be installed | ||
+ | - |
Revision as of 10:10, 16 January 2020
TechInc Member | |
---|---|
nickname | 3p!c |
Memberstatus | member |
Tasks | being present while lurking mate |
URL | http://www.justopen.org |
iwantmy@freedom.nl | |
Part of Projects | BlackHat-RGB-LedMatrix, FOSDEM, Domotica, Maemo, Arduino, Rpi, Soldering, Android, Another World Now, Internet Governance and hackers, Beehive-Embeded-Electronical-System (Bees) |
Free text: Hell yeah! I'm for Free text! I'm for Free things in general, free-source also ATM i'm not attending as many socials as I would like due to several reasons. in 2020 I promised myself to only attend more.
One reason is my health which sadly has in some mysterious ways left me wanting. So I'm health hacking ATM also. But also the total renovation of a 30's house which is going to be rigged with domotica in almost every way thinkable by me.
House:
Plans: - Drawn in 3D in Sketch-UP (which was the only workable option with my architect).
Walls/Separation - Most of the walls are going to be done in metal stud.
mostly because the choice fell on sliding door system from Xinnix which IMHO are awesom and i think easily mod'dable with Magnetic locks. but easily integrate-able with metal stud walls. Plus less wood which saves trees and less work cutting it all to size. Hope it will soundproof as well as a woodframe drywall.
- Doors systems, most of them are installed already downstairs in the souterain (posh French for half basement)
Wiring
- ATM already 1,5Km's of CAT 8 cable is installed in the walls. - Most of the electric 220v cabling is in place - Most of the signalling cable is in place (sensors, automated doors etc) - Switch cupboard - Switchboard EATON Medusa 72 modules, https://www.groepenkastbestellen.nl/EATON-EAT-GR.KAST-MEDUSA-LEEG-per-1-stuk(s)- - 20 x 16a EATON automatic switches - 4 lightning surge protectors (moeller series) http://www.eaton.co.za/EatonSA/ProductsSolutions/Electrical/ProductsServices/CircuitProtection/SurgeProtectionDevice/index.htm - Relais board
Heating - Most of the airventilation is in place (air and heat recycling unit) - Most the airpipes for the environmentally friendly central heating powering fireplace need to still be placed
Plumbing - Dyka Sono partially in place still some parts need doing in the basement mostly - Uponor ISO 20mm still need doing - Pentair Jung Compli 300e sewage fecal pump still needs to be installed -