Difference between revisions of "Techinc Infra"
Line 10: | Line 10: | ||
What has been done: | What has been done: | ||
− | Hypervisor RED is up and configured. | + | <br> Hypervisor RED is up and configured. |
Hypervisor BLUE is up and configured. | Hypervisor BLUE is up and configured. | ||
LACP between core switch and glassroom switch is up. | LACP between core switch and glassroom switch is up. |
Revision as of 16:01, 16 June 2014
Projects | |
---|---|
Participants | |
Skills | Networking, Security, Planning |
Status | Active |
Niche | Software |
Purpose | Infrastructure |
This Project is the birth of stable, fast, reliable infra withen techinc.
What has been done:
Hypervisor RED is up and configured.
Hypervisor BLUE is up and configured.
LACP between core switch and glassroom switch is up.
Fiber and Power has been pulled to glassroom.
Basic Documentation.
LACP Between hypervisors and the Glassroom Switch is up.
Remote Powerbars control
Powerbars are on two seperate groups in TI.
Shardik VM
Webserver VM
Monitoring VM
What needs to be done:
LDAP Migration RADUIS Migration Administration server - Documentation/Passwords CUPS Print Server for the space Printers. Backup and Recovery Cluster Failover