==Floor in dirty room== | ==Floor in dirty room== | ||
* Justa brought laminate | * Justa brought laminate | ||
− | * Maarten: floor will be ruined later | + | * Maarten: floor will be ruined if people will decide later (after discussion with members) that the wall is taken down between the two small rooms |
* Decision: wait with floor, focus on new room first. Floor panels will be stored in storage room to prevent damage to the panels | * Decision: wait with floor, focus on new room first. Floor panels will be stored in storage room to prevent damage to the panels | ||
* Test if existing carpet is suitable as underlayment | * Test if existing carpet is suitable as underlayment |
Revision as of 01:09, 13 February 2014
Contents
Young hackspace on Sunday
Becha: both spaces are needed for the young hackspace. Please make sure that the space is usable. So, no tools, sharp edges, wet paint, etc on Sunday please
Painting
Narya: ErwinC64 and Narya will do this next week
- Glass fiber stuff on the newspaper wall (tip from Rop: use gloves)
- Make it smooth
- Paint it white
- We will buy the materials and try to keep the costs low
- Only do the newspaper wall (quiet room might get shelves, a doorway will be made in the big wall first)
Ceiling
Preferably no big changes. Perhaps install impregnated fabric, but there is no rush with that.
Doors
- UR donated two doors
- Minimal width: plotter should be able to fit through it
- Maarten: no need for doors. Benefit will be that the rooms will not be too separate. Look one month from now if this works, otherwise install doors then. Preferable 180cm wide
- Piele: make door opening two doors wide
- Rop: in which direction? Justa: can be decided later
- Justa: make hole, see if wall is sturdy enough to install frame. If not, make sure to strengthen the frame
- Some suggestions mentioned: wood construction, wedge, jack
- Cmpxchg: can we get frame via UR? Probably yes. Wood is available via Remko
- Rop: are there plans to start tomorrow? People in room: no, but perhaps others would like to start?
Saturday 10:00 people will work on making hole in the wall
Who brings what will be arranged via e-mail
Floor in dirty room
- Justa brought laminate
- Maarten: floor will be ruined if people will decide later (after discussion with members) that the wall is taken down between the two small rooms
- Decision: wait with floor, focus on new room first. Floor panels will be stored in storage room to prevent damage to the panels
- Test if existing carpet is suitable as underlayment
Electricity
- Philip: already plans for electricity?
- Maarten: power block is in place including wiring. Needs to be hooked on to the fuse box
- Location of the fuse box? Depends on destination of the smaller rooms, which needs to be discussed with members. Options mentioned:
- in current clean room behind the fridge (water needs to be installed on other wall in that case)
- Phicoh: perhaps between kitchen and emergency door
- install in clean room and place it somewhere else later (problem: rewiring)
Remarks and suggestions
Skinnr
- were there other suggestions after the proposal? Except a comment about the door width (Ultratux: make it wide enough for the plotter) there were no other suggestions or objections. The response was positive in general.
- are there official drawings of the building? No, just floor plans without details. Suggestion: make sure to document what we do ourselves