Difference between revisions of "Pledges/Presentation Infrastructure"
(page not updated in >4 years, member left...) |
|||
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
{{Pledge | {{Pledge | ||
+ | |Pledge Type=Infrastructure | ||
|Pledge Leader=User:Peter | |Pledge Leader=User:Peter | ||
|Running Total=0 | |Running Total=0 | ||
− | |Status= | + | |Status=Failed |
}} | }} | ||
__NOTOC__ __NOEDITSECTION__ | __NOTOC__ __NOEDITSECTION__ | ||
− | |||
[Note that this is not yet an active pledge drive. This wiki page serves to collect | [Note that this is not yet an active pledge drive. This wiki page serves to collect | ||
Line 28: | Line 28: | ||
==Pledges== | ==Pledges== | ||
* €?? -- ??? | * €?? -- ??? | ||
− | |||
− | |||
− | |||
− |
Latest revision as of 02:15, 15 February 2017
Pledge | |
---|---|
Specification | |
Pledge Type | Infrastructure |
Pledge Leader | User:Peter |
Approximate Target | € |
Running Total | €0 |
Status | Failed |
[Note that this is not yet an active pledge drive. This wiki page serves to collect the initial ideas, cost estimates, etc. which will eventually be needed to proceed with either a pledge drive or pursuing other types of funding.]
To allow for presentations, workshops and similar activities in the new ACTA space, we need to purchase some amount of infrastructure items.
The current proposal (as of 1 Nov, 2012) is to put whiteboards along the wall between the entrance door and the door to the utility shaft (i.e. Wall 1-4 when numbering corners clockwise with the main door corner being number 1). In addition we would aim to have a pull down projector screen located in front of the whiteboards and a ceiling mounted projector/beamer. Cabling to attach a computer to the beamer, to the audio system, etc. should also be along Wall 1-4.
Items needed and cost estimates
- Whiteboard(s)
- etc. etc. (To be filled in)
Pledges
- €?? -- ???