Difference between revisions of "User:3p1c"

From Technologia Incognita
Jump to: navigation, search
Line 1: Line 1:
 
{{Members
 
{{Members
|picture=3p1c-sailing.jpeg
+
|picture=JonAndMe.jpeg
 
|Nickname=3p!c
 
|Nickname=3p!c
 
|Memberstatus=member
 
|Memberstatus=member

Revision as of 10:25, 16 January 2020

TechInc Member
JonAndMe.jpeg
nickname 3p!c
Memberstatus member
Tasks being present while lurking mate
URL http://www.justopen.org
Email iwantmy@freedom.nl
Part of Projects BlackHat-RGB-LedMatrix, FOSDEM, Domotica, Maemo, Arduino, Rpi, Soldering, Android, Another World Now, Internet Governance and hackers, Beehive-Embeded-Electronical-System (Bees)

Free text: Hell yeah! I'm for Free text!

   I'm for Free things in general, free-source also
   ATM i'm not attending as many socials as I would like due to several reasons.
   in 2020 I promised myself to attend more.
   So i decided since the house is such a big bunch of projects and i'm learning a lot from them to make them TechInc projects.
   This way i'm more socially available in the space, other people can join in and help/criticise/learn. 

One reason is my health which sadly has in some mysterious ways left me wanting. So I'm health hacking ATM also. But also the total renovation of a 30's house which is going to be rigged with domotica in almost every way thinkable by me.

House:

Plans: - Drawn in 3D in Sketch-UP (which was the only workable option with my architect).

Walls/Separation - Most of the walls are going to be done in metal stud.

  mostly because the choice fell on sliding door system from Xinnix which IMHO are very nice.
  and i think easily mod'dable with Magnetic locks. but easily integrate-able with metal stud walls.
  Plus less wood which saves trees and less work cutting it all to size.
  Hope it will soundproof as well as a woodframe drywall.

- Doors systems, most of them are installed already downstairs in the souterain (posh French for half basement)


Wiring - ATM already 1,5Km's of CAT 8 cable is installed in the walls. - Most of the electric 220v cabling is in place - Most of the signalling cable is in place (sensors, automated doors etc) - Switch cupboard - Switchboard EATON Medusa 72 modules, https://www.groepenkastbestellen.nl/EATON-EAT-GR.KAST-MEDUSA-LEEG-per-1-stuk(s)- - 20 x 16a EATON automatic switches - 4 lightning surge protectors (moeller series) http://www.eaton.co.za/EatonSA/ProductsSolutions/Electrical/ProductsServices/CircuitProtection/SurgeProtectionDevice/index.htm - Relais board (going to use hacked and flashed Sonoff 4ch Pro mostly atm

Heating - Most of the airventilation is in place (air and heat recycling unit) - Most the airpipes for the environmentally friendly central heating powering fireplace need to still be placed

Plumbing - Dyka Sono partially in place still some parts need doing in the basement mostly - Uponor ISO 20mm still need doing - Pentair Jung Compli 300e sewage fecal pump still needs to be installed -