Difference between revisions of "Pledges/Presentation Infrastructure"

From Technologia Incognita
Jump to: navigation, search
(Created page with "__NOTOC__ __NOEDITSECTION__ 300px|thumb|right|Picture of the item [Note that this is not yet an active pledge drive. This wiki page serves to col...")
 
(page not updated in >4 years, member left...)
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
 +
{{Pledge
 +
|Pledge Type=Infrastructure
 +
|Pledge Leader=User:Peter
 +
|Running Total=0
 +
|Status=Failed
 +
}}
 
__NOTOC__ __NOEDITSECTION__
 
__NOTOC__ __NOEDITSECTION__
[[File:Pledge_template.jpg|300px|thumb|right|Picture of the item]]
 
  
 
[Note that this is not yet an active pledge drive. This wiki page serves to collect  
 
[Note that this is not yet an active pledge drive. This wiki page serves to collect  
Line 16: Line 21:
 
beamer, to the audio system, etc. should also be along Wall 1-4.
 
beamer, to the audio system, etc. should also be along Wall 1-4.
  
'''Pledge leader:''' [[User:Peter|Peter]]
 
  
 
==Items needed and cost estimates==
 
==Items needed and cost estimates==
Line 24: Line 28:
 
==Pledges==
 
==Pledges==
 
* €?? -- ???
 
* €?? -- ???
 
Running total: '''€0''
 
 
Approximate target: '''€???'''
 
 
 
[[Category:Pledges]]
 

Latest revision as of 03:15, 15 February 2017

Pledge
Specification
Pledge Type Infrastructure
Pledge Leader User:Peter
Approximate Target
Running Total €0
Status Failed


[Note that this is not yet an active pledge drive. This wiki page serves to collect the initial ideas, cost estimates, etc. which will eventually be needed to proceed with either a pledge drive or pursuing other types of funding.]

To allow for presentations, workshops and similar activities in the new ACTA space, we need to purchase some amount of infrastructure items.

The current proposal (as of 1 Nov, 2012) is to put whiteboards along the wall between the entrance door and the door to the utility shaft (i.e. Wall 1-4 when numbering corners clockwise with the main door corner being number 1). In addition we would aim to have a pull down projector screen located in front of the whiteboards and a ceiling mounted projector/beamer. Cabling to attach a computer to the beamer, to the audio system, etc. should also be along Wall 1-4.


Items needed and cost estimates

  • Whiteboard(s)
  • etc. etc. (To be filled in)

Pledges

  • €?? -- ???