Difference between revisions of "Techinc Infra"
Line 30: | Line 30: | ||
Backup and Recovery <br> | Backup and Recovery <br> | ||
Cluster Failover <br> | Cluster Failover <br> | ||
+ | |||
+ | <b> The following diagram is a design of how the currant infra is </b> <br> | ||
+ | |||
+ | Place HOLDER * | ||
+ | |||
+ | <b> Future Possible Concept </b> | ||
+ | |||
+ | Concept A the Core, Access, Distribution with single link fault tolarance between switches. | ||
[[File:Network Concept A .svg|1000px]] | [[File:Network Concept A .svg|1000px]] |
Revision as of 16:25, 16 June 2014
Projects | |
---|---|
Participants | |
Skills | Networking, Security, Planning |
Status | Active |
Niche | Software |
Purpose | Infrastructure |
This Project is the birth of stable, fast, reliable infra withen techinc.
What has been done:
Hypervisor RED is up and configured.
Hypervisor BLUE is up and configured.
LACP between core switch and glassroom switch is up.
Fiber and Power has been pulled to glassroom.
Basic Documentation.
LACP Between hypervisors and the Glassroom Switch is up.
Remote Powerbars control
Powerbars are on two seperate groups in TI.
Shardik VM
Webserver VM
Monitoring VM
What needs to be done:
LDAP Migration
RADUIS Migration
Administration server - Documentation/Passwords
CUPS Print Server for the space Printers.
Backup and Recovery
Cluster Failover
The following diagram is a design of how the currant infra is
Place HOLDER *
Future Possible Concept
Concept A the Core, Access, Distribution with single link fault tolarance between switches.