Difference between revisions of "ActaRoom2 proposal/Notes20140212"

From Technologia Incognita
Jump to: navigation, search
(Notes aux room discussion on 12 Feb 2014)
 
m
Line 8: Line 8:
 
* Paint it white
 
* Paint it white
 
* We will buy the materials and try to keep the costs low
 
* We will buy the materials and try to keep the costs low
 +
* Only do the newspaper wall (quiet room might get shelves, a doorway will be made in the big wall first)
  
 
==Ceiling==
 
==Ceiling==

Revision as of 01:04, 13 February 2014

Young hackspace on Sunday

Becha: both spaces are needed for the young hackspace. Please make sure that the space is usable. So, no tools, sharp edges, wet paint, etc on Sunday please

Painting

Narya: ErwinC64 and Narya will do this next week

  • Glass fiber stuff on the newspaper wall (tip from Rop: use gloves)
  • Make it smooth
  • Paint it white
  • We will buy the materials and try to keep the costs low
  • Only do the newspaper wall (quiet room might get shelves, a doorway will be made in the big wall first)

Ceiling

Preferably no big changes. Perhaps install impregnated fabric, but there is no rush with that.

Doors

  • UR donated two doors
  • Minimal width: plotter should be able to fit through it
  • Maarten: no need for doors. Benefit will be that the rooms will not be too separate. Look one month from now if this works, otherwise install doors then. Preferable 180cm wide
  • Piele: make door opening two doors wide
  • Rop: in which direction? Justa: can be decided later
  • Justa: make hole, see if wall is sturdy enough to install frame. If not, make sure to strengthen the frame
    • Some suggestions mentioned: wood construction, wedge, jack
  • Cmpxchg: can we get frame via UR? Probably yes. Wood is available via Remko
  • Rop: are there plans to start tomorrow? People in room: no, but perhaps others would like to start?

Saturday 10:00 people will work on making hole in the wall

Who brings what will be arranged via e-mail

Floor in dirty room

  • Justa brought laminate
  • Maarten: floor will be ruined later will be decided (after discussion with members of course) that the wall is taken down between the two small rooms
  • Decision: wait with floor, focus on new room first. Floor panels will be stored in storage room to prevent damage to the panels
  • Test if existing carpet is suitable as underlayment

Electricity

  • Philip: already plans for electricity?
  • Maarten: power block is in place including wiring. Needs to be hooked on to the fuse box
  • Location of the fuse box? Depends on destination of the smaller rooms, which needs to be discussed with members. Options mentioned:
    • in current clean room behind the fridge (water needs to be installed on other wall in that case)
    • Phicoh: perhaps between kitchen and emergency door
    • install in clean room and place it somewhere else later (problem: rewiring)


Remarks and suggestions

Skinnr

  • were there other suggestions after the proposal? Except a comment about the door width (Ultratux: make it wide enough for the plotter) there were no other suggestions or objections. The response was positive in general.
  • are there official drawings of the building? No, just floor plans without details. Suggestion: make sure to document what we do ourselves